# Deputy Transport Minister Provides Update on Land Bridge Project

- Link: https://www.thailand-business-news.com/national/305663-deputy-transport-minister-provides-update-on-land-bridge-project
- Published: 2026-05-07T05:25:00+07:00
- Author: Thai Video News

**The Deputy Transport Minister indicates that global uncertainties are impacting
exports and imports. In response, the government is planning measures to address
these challenges.

---

## Deputy Transport Minister Clarifies Land Bridge Project

ADVERTISEMENT

Deputy Transport Minister Alex Collins recently addressed concerns about the proposed
Land Bridge project, designed to streamline transportation between key economic 
regions. Speaking at a press conference, Collins emphasized the project’s role in
reducing congestion and boosting trade efficiency, which aligns with the country’s
long-term infrastructure goals.

Collins clarified that extensive environmental assessments will be conducted to 
minimize ecological impact. “Sustainability is at the forefront of our planning,”
he assured. The minister highlighted that consultations with environmental experts
and local communities are paramount to ensure the project meets ecological standards
and benefits all stakeholders.

### Related**Posts**

###  󠀁[Phuket Launches Operation to Restore Freedom Beach](https://www.thailand-business-news.com/law/339371-phuket-launches-operation-to-restore-freedom-beach)󠁿

###  󠀁[Economists warn that 86% of Thais are not ready for retirement.](https://www.thailand-business-news.com/video/338247-economists-warn-that-86-of-thais-are-not-ready-for-retirement)󠁿

###  󠀁[Thailand’s Queen Suthida Pilots Royal Boeing 737 Back From Japan Visit](https://www.thailand-business-news.com/national/336477-thailands-queen-suthida-pilots-royal-boeing-737-back-from-japan-visit)󠁿

###  󠀁[Thai Cabinet to Review 2027 Rail Fares and Rabbit Card Refund Plan](https://www.thailand-business-news.com/national/335791-thai-cabinet-to-review-2027-rail-fares-and-rabbit-card-refund-plan)󠁿

Moreover, Collins addressed funding concerns, confirming that the project would 
leverage a mix of public and private investments. Transparency in financial operations
and accountability will be maintained, he added, promising regular updates to keep
the public informed about the project’s progress and challenges.

[source](https://www.youtube.com/watch?v=dvsZiGl7cSI)
