# Focus Graphite Advances Lac Knife Toward Construction Readiness with Up to C$1.93 Million in Combined Government Infrastructure Support

- Link: https://www.thailand-business-news.com/pr-news/focus-graphite-advances-lac-knife-toward-construction-readiness-with-up-to-c1-93-million-in-combined-government-infrastructure-support
- Published: 2026-10-15T16:15:00+07:00
- Author: Media OutReach

#### _Project access road geotechnical investigations and detailed engineering advance as Focus progresses critical transportation infrastructure planning_

Ottawa, Ontario – [Newsfile Corp.](https://www.newsfilecorp.com/) – October 15, 
2026 – **Focus Graphite Inc. (TSXV: FMS) (OTCQB: FCSMF) (FSE: FKC0) **(“**Focus**”
or the “**Company**“), a Canadian developer of high-grade flake graphite deposits
and advanced graphite materials for battery, defence, and industrial applications,
is pleased to announce the engagement of Construction & Expertise PG (“**PG**“) 
to advance geotechnical investigations and detailed engineering for the proposed
all-season access road to its flagship Lac Knife Graphite Project (“**Lac Knife**”
or the “**Project**“) in Quebec.

 The engagement marks an important step toward construction readiness and forms 
part of a broader infrastructure initiative supported by up to C$1,932,750 in combined
non-dilutive federal and provincial funding. This includes newly approved non-repayable
financial assistance of up to C$554,050 from the Societe du Plan Nord (“**SPN**“),
representing 50% of eligible access road planning and development costs under its
Northern Infrastructure Fund in Support of the Mining Sector (_Enveloppe nordique
d’infrastructures en appui au secteur minier)_, and previously announced support
of up to C$1,378,700 from Natural Resources Canada (“**NRCan**“) through its First
and Last Mile Fund (“**FLMF**“). The provincial contribution is dedicated exclusively
to the access road, while the federal funding supports pre-construction planning
for both the road and the electrical infrastructure required to connect Lac Knife
to Hydro-Quebec’s power network.

 Together, these complementary investments are helping advance the transportation
and energy infrastructure necessary for Lac Knife’s development while allowing the
Company to preserve capital for its broader project development and advanced materials
strategy.

 **Advancing Lac Knife’s Access Road Toward Construction Readiness**

 The proposed all-weather gravel access road will connect the Lac Knife Project 
site to Highway 389, providing reliable year-round access to support future mine
construction, personnel transportation, equipment mobilization and the eventual 
transportation of graphite concentrate. PG’s mandate encompasses geotechnical and
geophysical investigations, subsurface characterization, evaluation of construction
materials and engineering activities required to advance a construction-ready access
road design. Key deliverables will include preliminary and final engineering drawings,
technical specifications, a bill of quantities, detailed cost estimates, a construction
schedule and tender documents to support future construction planning and procurement.

 The program includes:

 *  Approximately eleven (11) kilometres of geophysical investigations using seismic
   refraction and multichannel analysis of surface waves (MASW), including associated
   data processing, interpretation and technical reporting.
 *  Approximately sixty (60) geotechnical test pits along the proposed road corridor
   to characterize subsurface conditions, assess soil and foundation properties,
   and inform road design requirements.
 *  Reconnaissance and sampling of potential borrow material sources, supported 
   by laboratory testing of foundation soils and construction materials to evaluate
   their suitability for road construction.
 *  Targeted geotechnical drilling at critical locations along the proposed road
   corridor, where warranted by field investigation results and subject to additional
   authorization.
 *  High-resolution drone-based topographic surveys of the proposed road corridor
   and any revised alignments, to support final engineering design and future construction
   planning.
 *  Development of geotechnical profiles, pavement design recommendations and associated
   technical reporting to support detailed road and drainage engineering.

 The field investigation program has advanced substantially, generating critical
technical data to refine engineering designs, optimize construction requirements
and support the next phase of project development.

 “Infrastructure is what transforms a mineral resource into a strategic asset,” 
said Dean Hanisch, Chief Executive Officer of Focus Graphite. “With PG advancing
the technical work required for our access road, we are translating project planning
into tangible steps towards construction readiness. The support of the Governments
of Québec and Canada allows us to advance this essential infrastructure while maintaining
a disciplined approach to capital allocation and project development.”

 The coordinated advancement of road access and grid connection planning is intended
to strengthen Lac Knife’s development readiness, reduce infrastructure-related uncertainty
and establish the technical foundation for future construction.

 “Support from two levels of government for complementary infrastructure initiatives
underscores the strategic importance of advancing Lac Knife,” said Jason Latkowcer,
Vice President, Corporate Development of Focus Graphite. “We are systematically 
removing barriers to development, reducing risk and strengthening Lac Knife’s investment
case, while leveraging non-dilutive funding to minimize shareholder dilution.”

 **Responsible Infrastructure Development**

 The Lac Knife Project is located on the Nitassinan, the ancestral lands of the 
Innu Takuaikan Uashat mak Mani-utenam (“**ITUM**“). Focus has maintained a collaborative
relationship with ITUM since entering into a Pre-Development Agreement in 2014 and
continues to advance project planning in collaboration with the community.

 The Company’s infrastructure strategy prioritizes the use of existing transportation
corridors wherever practical, with the objective of minimizing new environmental
disturbance while supporting responsible project development.

 The proposed access road and electrical connection are fundamental components of
Lac Knife’s long-term development strategy. Together, they are intended to establish
reliable year-round access and support the transition toward grid-connected mining
and processing operations.

 Lac Knife hosts one of North America’s highest-grade natural graphite deposits 
and serves as the upstream foundation of Focus Graphite’s strategy to establish 
an integrated advanced graphite materials platform serving battery, defence, nuclear
energy and advanced manufacturing supply chains.

 **Qualified Person**

 The technical content disclosed in this news release was reviewed and approved 
by Richard Pearce, PE, President of Brasil Insight Capital LLC., a consultant to
the Company, and a qualified person as defined under National Instrument NI 43-101.

 **About Construction & Expertise PG **

 Construction & Expertise PG Inc. (PG) is an integrated engineering, construction
and industrial maintenance company serving the mining and industrial sectors across
Quebec and Newfoundland and Labrador. Founded in 2006, PG has grown to more than
400 employees, with a permanent engineering office and laboratory in Wabush supporting
the surrounding mining region. PG’s approach goes beyond traditional consulting 
and contracting. The company believes successful mining projects are built on strong
relationships, trusted partnerships, safe execution and quality work. By bringing
engineering, technical services and construction capabilities together under one
organization, PG works alongside its clients as a long-term regional partner, from
project development and technical investigation through construction and operations.

 For more information on Construction & Expertise PG Inc. please visit [https://pgconstruction.ca/en](https://api.newsfilecorp.com/redirect/mjmzNUkE5q).

 **About Focus Graphite Inc.**

 Focus Graphite is building an integrated graphite platform to supply the industries
shaping the future. Through the development of world-class graphite resources, advanced
processing technologies and higher-value advanced materials, the Company is positioning
itself to support battery, defence, advanced manufacturing and other strategic industries
across North America and allied markets.

 The platform is anchored by the Company’s two 100%-owned graphite assets in Quebec.
Lac Knife is one of North America’s highest-grade feasibility-stage graphite deposits,
while Lac Tetepisca is one of the largest identified graphite resources globally.
Together with strategic technology partnerships and government-supported innovation
initiatives, these assets provide the foundation for a secure, scalable and increasingly
integrated graphite supply chain.

 For more information on Focus Graphite Inc. please visit [http://www.focusgraphite.com](https://api.newsfilecorp.com/redirect/kXGrLUQwKb)

 LinkedIn: [https://www.linkedin.com/company/focus-graphite/](https://api.newsfilecorp.com/redirect/B5b1eF2WXR)

Facebook: [https://www.facebook.com/focusgraphite](https://api.newsfilecorp.com/redirect/5W3YbU3Gw1)
X: [https://x.com/focusgraphite](https://api.newsfilecorp.com/redirect/LqbJrtp5QR)

 **Investors Contact: **

 Dean Hanisch 
 CEO, Focus Graphite Inc.  [dhanisch@focusgraphite.com](https://www.thailand-business-news.com/pr-news/dhanisch@focusgraphite.com)
+1 (613) 612-6060

 Jason Latkowcer 
 VP Corporate Development  [jlatkowcer@focusgraphite.com](https://www.thailand-business-news.com/pr-news/jlatkowcer@focusgraphite.com)

 _**Cautionary Note Regarding Forward-Looking Statements**_

 _Certain statements contained in this press release constitute forward-looking 
information. These statements relate to future events or future performance. The
use of any of the words “could,” “intend,” “expect,” “believe,” “will,” “projected,”“
estimated,” and similar expressions, as well as statements relating to matters that
are not historical facts, are intended to identify forward-looking information and
are based on the Company’s current beliefs or assumptions as to the outcome and 
timing of such future events._

 _In particular, this press release contains forward-looking information regarding,
among other things: the engagement of Construction & Expertise PG and the anticipated
completion of its geotechnical investigations, geophysical surveys, subsurface characterization,
engineering studies and detailed road and drainage designs; the anticipated receipt
and use of funding from the Société du Plan Nord and Natural Resources Canada’s 
First and Last Mile Fund; and the completion of planning, engineering, environmental
studies, route optimization, permitting and design activities associated with the
proposed all-season access road and Hydro-Quebec electrical connection._

 _Such forward-looking information also includes the advancement of the Lac Knife
Graphite Project toward permitting, construction readiness and future development;
the anticipated benefits of the proposed access road and related infrastructure 
planning, including improved year-round access, enhanced project readiness, reduced
infrastructure-related development risk and support for future mine construction
and operations; and the Company’s ongoing collaboration with Innu Takuaikan Uashat
mak Mani-utenam (ITUM), including project planning activities and the proposed use
of existing transportation corridors wherever practical. Additional forward-looking
information includes the Company’s ability to satisfy the terms and conditions of
applicable funding agreements and obtain the full amount of committed government
support; the timing and outcome of regulatory approvals, permitting processes and
future development decisions; the Company’s ability to secure additional financing,
government support, strategic partnerships and offtake arrangements; the future 
construction, development and operation of the Lac Knife Graphite Project; and the
Company’s strategy to develop an integrated advanced graphite materials platform
serving battery materials, defence, nuclear energy and advanced manufacturing supply
chains in North America and allied markets._

 _The completion of detailed engineering and final infrastructure designs does not
constitute authorization to commence construction, which remains subject to applicable
permits, regulatory approvals, financing arrangements and future development decisions.
The Company anticipates providing further updates, as appropriate, as the project
progresses through subsequent design, permitting, financing and contracting phases._

 _Forward-looking statements are subject to known and unknown risks, uncertainties,
and other factors that may cause actual results, performance, or achievements to
differ materially from those expressed or implied by such statements. These risks
and uncertainties include, but are not limited to, risks related to market conditions,
regulatory approvals, changes in economic conditions, the ability to raise sufficient
funds on acceptable terms or at all, operational risks associated with mineral exploration
and development, and other risks detailed from time to time in the Company’s public
disclosure documents available under its profile on SEDAR+._

 _The forward-looking information contained in this release is made as of the date
hereof, and the Company is not obligated to update or revise any forward-looking
information, whether as a result of new information, future events, or otherwise,
except as required by applicable securities laws. Because of the risks, uncertainties,
and assumptions contained herein, investors should not place undue reliance on forward-
looking information._

 _Neither TSX Venture Exchange nor its Regulation Services accepts responsibility
for the adequacy or accuracy of this release._

The issuer is solely responsible for the content of this announcement.

![](//track.media-outreach.com/index.php/WebView/494328/36955)

**Source** : [Focus Graphite Advances Lac Knife Toward Construction Readiness with Up to C$1.93 Million in Combined Government Infrastructure Support](https://www.media-outreach.com/news/canada/2026/10/15/494328/?rand=186006)

---

  |  This article was produced by Media OutReach, our trusted news partner. The views expressed and the content presented here are solely those of the author and may not reflect the opinions of Thailand Business News. |

---

![Media OutReach Newswire](https://i0.wp.com/www.thailand-business-news.com/wp-content/
uploads/2025/04/media-outreach-20025.png?ssl=1)
