# PMET Resources Files Amended Version of its NI 43-101 Technical Report on the CV5 Lithium-Only Feasibility Study Previously Published in 2025 on its Shaakichiuwaanaan Project

- Link: https://www.thailand-business-news.com/pr-news/pmet-resources-files-amended-version-of-its-ni-43-101-technical-report-on-the-cv5-lithium-only-feasibility-study-previously-published-in-2025-on-its-shaakichiuwaanaan-project
- Published: 2026-10-03T04:00:00+07:00
- Author: PR Newswire

|   |

_Following a routine review by the Autorité des marchés financiers ("AMF"), the 
government agency responsible for regulating securities in the Province of Québec,
Canada, the Company has filed an amended Technical Report (as defined below) correcting
certain compliance-related irregularities._

**HIGHLIGHTS**

 ◦ The clarification, formatting and additional disclosure in the amended Technical
   Report **have no impact on the economic or technical conclusions of the 2025 
   Lithium-only FS** (as defined below) which remain as previously stated.
 ◦ The re-filing** is not to be confused with the previously announced updated feasibility
   study** inclusive of tantalum economics that is currently underway which the 
   Company intends to release in Q4 of this year.

MONTREAL, Oct. 3, 2026 /PRNewswire/ — Oct. 3, 2026 – SYDNEY, Australia  
**PMET 
Resources Inc. (the "Company" or "PMET") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (
FSE: R9GA) announces that, following a routine review pursuant to the continuous
disclosure review program by the AMF, it has filed on [SEDAR+](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4788772-1&h=1751584972&u=https%3A%2F%2Fwww.sedarplus.ca%2Fhome%2F&a=SEDAR%2B)
an amended version, with an unchanged effective date of October 20, 2025, an issue
date of November 14, 2025 and an amended date of October 2, 2026, of its previously
filed technical report for the Shaakichiuwaanaan Project titled "_CV5 Pegmatite 
Lithium-Only Feasibility Study NI 43-101 Technical Report – Shaakichiuwaanaan Project"_(
the "Technical Report"), prepared in accordance with National Instrument 43-101 –
Standards of Disclosure for Mineral Projects ("NI 43-101"). The amended Technical
Report is a reissuance of the results originally announced in the [October 20, 2025, news release](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4788772-1&h=4078943662&u=https%3A%2F%2Fwww.pmet.ca%2Fnews%2Fpmet-resources-delivers-positive-cv5-lithium-only-feasibility-study-for-its-large-scale-shaakichiuwaanaan-project%2F&a=October+20%2C+2025%2C+news+release)
by the Company announcing a positive lithium-only feasibility study ("FS") on the
CV5 Pegmatite outlining the potential for a large-scale mining operation at the 
Shaakichiuwaanaan Project.

The amended Technical Report addresses comments requesting clarification, formatting
and additional disclosure for compliance purposes in a small number of areas, including,
qualified persons’ certificates content, improper scaling and map formatting, clarifications
with respect to the reasonable prospects for eventual economic extraction for caesium,
tantalum, and gallium, and clarifications with respect to the cut-off grade for 
caesium oxide.

**The corrections causing the refiling do not, in any way, shape or form, affect
the economic or technical conclusions of the FS. Furthermore, this amended Technical
Report is not to be confused with the previously announced updated feasibility study
inclusive of tantalum economics that the Company currently has underway and intends
to release in Q4 of this year.**

The amended version of the report is available on [SEDAR+](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4788772-1&h=1751584972&u=https%3A%2F%2Fwww.sedarplus.ca%2Fhome%2F&a=SEDAR%2B)
and will be available shortly thereafter on the Company’s website. Readers are encouraged
to read the amended Technical Report in its entirety, including all qualifications,
assumptions, exclusions and risks that relate to the Mineral Resource, Mineral Reserve,
and life of mine plan. The amended Technical Report is intended to be read as a 
whole, and sections should not be read or relied upon out of context.

**About PMET Resources Inc.**

PMET Resources Inc. is a pegmatite critical mineral exploration and development 
company focused on advancing its district-scale 100%-owned Shaakichiuwaanaan Property
located in the Eeyou Istchee James Bay region of Quebec, Canada, which is accessible
year-round by all-season road and proximal to regional hydro-power infrastructure.

In late 2025, the Company announced a positive lithium-only Feasibility Study on
the CV5 Pegmatite for the Shaakichiuwaanaan Property and declared a maiden Mineral
Reserve of 84.3 Mt at 1.26% Li_(2)O (Probable)^(1). The study outlines the potential
for a competitive and globally significant high-grade lithium project targeting 
up to ~800 ktpa spodumene concentrate using a simple Dense Media Separation ("DMS")
only process flowsheet. Further, the results highlight Shaakichiuwaanaan as a potential
North American critical mineral powerhouse with significant opportunity for tantalum
and caesium in addition to lithium.

The Project hosts a Consolidated Mineral Resource^(2) totalling 108.0 Mt at 1.40%
Li_(2)O and 166 ppm Ta_(2)O_(5) (Indicated) and 33.4 Mt at 1.33% Li_(2)O and 155
ppm Ta_(2)O_(5) (Inferred), and ranks as a top ten lithium pegmatite globally in
size. Additionally, the Project hosts the world’s largest pollucite-hosted caesium
pegmatite Mineral Resource at the Rigel and Vega zones with 0.69 Mt at 4.40% Cs_(
2)O (Indicated), and 1.70 Mt at 2.40% Cs_(2)O (Inferred).

________________________
^(1) _See Feasibility Study news release dated October 
20, 2025. Probable Mineral Reserve cut-off grade is 0.40% Li___(2)__O (open-pit)
and 0.70% Li___(2)__O (underground). Underground development and open-pit marginal
tonnage containing material above 0.37% Li___(2)__O are also included in the statement.
Effective Date of September 11, 2025._

This news release has been approved by

"_KEN BRINSDEN_"                               

Kenneth Brinsden, President, CEO, & Managing Director

**Qualified/Competent Person(s)**

The technical and scientific information in this news release that relates to the
Mineral Resource  Estimate, exploration, and metallurgical results for the Company’s
properties is based on, and fairly represents, information compiled by Mr. Darren
L. Smith, M.Sc., P.Geo., who is a Qualified Person as defined by NI 43-101, and 
member in good standing with the _Ordre des Géologues du Québec_ (Geologist Permit
number 01968), and with the Association of Professional Engineers and Geoscientists
of Alberta (member number 87868). Mr. Smith has reviewed and approved the related
technical information in this news release.

Mr. Smith is an Executive and Vice President of Exploration for PMET Resources Inc.
and holds common shares, Restricted Share Units (RSUs), Performance Share Units (
PSUs), and options in the Company.

Mr. Smith has sufficient experience, which is relevant to the style of mineralization,
type of deposit under consideration, and to the activities being undertaken to qualify
as a Competent Person as described by the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Smith consents 
to the inclusion in this news release of the matters based on his information in
the form and context in which it appears.

The information in this news release that relates to the Mineral Reserve Estimate
and Feasibility Study is based on, and fairly represents, information compiled by
Mr. Frédéric Mercier-Langevin, Ing. M.Sc., who is a Qualified Person as defined 
by NI 43-101, and member in good standing with the Ordre des Ingénieurs du Québec.
Mr. Mercier-Langevin has reviewed and approved the related technical information
in this news release.

Mr. Mercier-Langevin is the Chief Operating and Development Officer for PMET Resources
Inc. and holds common shares, RSUs, PSUs, and options in the Company.

In accordance with ASX Listing Rule 5.23, the Consolidated MRE and Mineral Reserve
for the Shaakichiuwaanaan Project in this news release was first reported in accordance
with ASX Listing Rules 5.8 and 5.9 by the Company in market announcements titled"
World’s Largest Pollucite-Hosted Caesium Pegmatite Mineral Resource Defined at Shaakichiuwaanaan"
dated July 20, 2025 (Montreal time) and "PMET Resources Delivers Positive CV5 Lithium-
Only Feasibility Study for its Large-Scale Shaakichiuwaanaan Project" dated October
20, 2025 (Montreal time). The Company confirms that, as of the date of this news
release, it is not aware of any new information or data verified by the competent
person that materially affects the information included in the announcements and
that all material assumptions and technical parameters underpinning the estimates
in the announcements continue to apply and have not materially changed. The Company
confirms that, as at the date of this news release, the form and context in which
the competent person’s findings are presented have not been materially modified 
from the original market announcements.

The information in this news release that relates to the production target and forecast
financial information derived from the production target from the FS for the Shaakichiuwaanaan
Project was first reported by the Company in accordance with ASX Listing Rules 5.16
and 5.17 in a market announcement titled "PMET Resources Delivers Positive CV5 Lithium-
Only Feasibility Study for its Large-Scale Shaakichiuwaanaan Project" dated October
20, 2025 (Montreal time). The Company confirms that, as of the date of this news
release, all material assumptions underpinning the production target and forecast
financial information in the original announcement continue to apply and have not
materially changed.

________________
_^(2)__ Consolidated MRE (CV5 + CV13 pegmatites) is reported at
an Li___(2)__O cut-off grade of 0.40% (open-pit), 0.60% (underground CV5), and 0.70%(
underground CV13). A grade constraint of 0.50% Cs___(2)__O was used to model the
Rigel and Vega caesium zones, contained entirely within CV13. The Effective Date
is June 20, 2025. Mineral Resources are not Mineral Reserves as they do not have
demonstrated economic viability. Mineral Resources are inclusive of Mineral Reserves._

**Disclaimer for Forward-Looking Information**

All statements, other than statements of present or historical facts, are forward-
looking statements. Forward-looking statements involve known and unknown risks, 
uncertainties and assumptions and accordingly, actual results could differ materially
from those expressed or implied in such statements. You are hence cautioned not 
to place undue reliance on forward-looking statements. Forward-looking statements
are typically identified by words or expressions such as "intend" or variations 
of such word or expressions and phrases or statements that certain actions, events
or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Forward-looking statements include, but are not limited to, statements concerning
the updated feasibility study inclusive of tantalum economics that the Company intends
to release in Q4 of this year and the production targets, processing methods and
potential for lithium, tantalum and caesium described in this news release..

Forward-looking statements are based upon certain assumptions and other important
factors that, if untrue, could cause actual results to be materially different from
future results expressed or implied by such statements. There can be no assurance
that forward-looking statements will prove to be accurate. Key assumptions upon 
which the Company’s forward-looking information is based include, without limitation,
the Company’s ability to complete the previously announced updated feasibility study
inclusive of tantalum economics on the anticipated timeline, that the results of
the updated feasibility study will be consistent with management’s current expectations
and will support the continued development of the project,  and the absence of material
adverse changes in general economic, market, political or regulatory conditions.

Forward-looking statements are also subject to risks and uncertainties facing the
Company’s business, any of which could have a material adverse effect on the Company’s
business, financial condition, results of operations and growth prospects. Readers
should review the detailed risk discussion in the Company’s most recent Annual Information
Form filed on SEDAR+, for a fuller understanding of the risks and uncertainties 
that affect the Company’s business and operations.

Although the Company believes its expectations are based upon reasonable assumptions
and has attempted to identify important factors that could cause actual actions,
events or results to differ materially from those described in forward-looking statements,
there may be other factors that cause actions, events or results not to be as anticipated,
estimated or intended. There can be no assurance that forward-looking information
will prove to be accurate. If any of the risks or uncertainties mentioned above,
which are not exhaustive, materialize, actual results may vary materially from those
anticipated in the forward-looking statements.

The forward-looking statements contained herein are made only as of the date hereof.
The Company disclaims any intention or obligation to update or revise any forward-
looking statements, whether as a result of new information, future events or otherwise,
except to the extent required by applicable law. The Company qualifies all of its
forward-looking statements by these cautionary statements.

CONTACT : Olivier Caza-Lapointe, Head, Investor Relations, T: +1 (514) 913-5264,
E: [ocazalapointe@pmet.ca](https://www.thailand-business-news.com/pr-news/ocazalapointe@pmet.ca)

---

  |  This article was produced by Cision PR Newswire, our trusted news partner. The views expressed and the content presented here are solely those of the author and may not fully reflect the opinions of Thailand Business News. |

---

 
**Read the original article :** [PMET Resources Files Amended Version of its NI 43-101 Technical Report on the CV5 Lithium-Only Feasibility Study Previously Published in 2025 on its Shaakichiuwaanaan Project ](http://www.prnasia.com/story/archive/5062873_AE62873_0?rand=184833)
