# Surge Announces Resource Upgrade at Nevada North: 657.5 Mt Grading @ 3,007 ppm Li Containing 10.5 Mt LCE Measured and Indicated Including 6.7 Mt LCE @ 3,820 ppm Li

- Link: https://www.thailand-business-news.com/pr-news/surge-announces-resource-upgrade-at-nevada-north-657-5-mt-grading-3007-ppm-li-containing-10-5-mt-lce-measured-and-indicated-including-6-7-mt-lce-3820-ppm-li
- Published: 2026-05-15T09:35:00+07:00
- Author: Media OutReach

West Vancouver, British Columbia – [Newsfile Corp.](https://www.newsfilecorp.com/)–
May 14, 2026 – Surge Battery Metals Inc. (TSXV: NILI) (OTCQX: NILIF) (FSE: DJ5) (
the “**Company**” or “**Surge**“) is pleased to announce that Nevada North Lithium,
LLC (“NNL”), the joint venture formed by Surge and Evolution Mining Limited (“Evolution”),
has reported an updated Mineral Resource Estimate (“MRE”) for the Nevada North Lithium
Project (“NNLP”) containing 10.5 Mt of Lithium Carbonate Equivalent (LCE) grading
3,007 ppm Li Measured and Indicated which includes 6.7Mt LCE @ 3,820 ppm Li highlighting
significant scalability potential from the Preliminary Economic Assessment (PEA)
mine plan that consumes only 3.6Mt @ 4016 ppm Li.

 Following a targeted infill and step-out drilling campaign comprising nine drill
holes, the updated MRE demonstrates an 87% conversion of the PEA mine pit into higher-
confidence Measured and Indicated (M&I) resource categories. This ratio of boreholes
to resource highlights the clear continuity of the deposit and firmly establishes
NNLP as one of the leading lithium clay deposits in North America.

 **Highlights of the Updated Mineral Resource Estimate:**

 *  **Initial High-Grade M&I Resource Established: **The Project now hosts a Measured
   and Indicated Resource of 657.5 million tonnes grading 3,007 ppm Li, containing
   10.5 million tonnes of Lithium Carbonate Equivalent (LCE).
 *  **High Conversion:** The recent drilling successfully converted approximately
   87% of the original PEA mine pit into the M&I category, securing the foundation
   of the deposit.
 *  **High-Grade Expansion:** The drill program successfully defined significant
   new volumes of higher-grade M&I resource outside the boundaries of the original
   PEA mine pit, providing optimization and scalability opportunities for the in-
   process Pre-Feasibility Study (PFS) as the PEA mine plan consumes only 3.6Mt @
   4016 ppm Li.
 *  **Significant Inferred Expansion: **Excluding the totals attributed to Measured
   and Indicated classifications, the Inferred Resource still hosts 271.3 million
   tonnes grading 2,160 ppm Li, containing 3.1 million tonnes of LCE, pushing the
   mineralized footprint well beyond the boundaries of the 2025 Preliminary Economic
   Assessment (PEA).
 *  **Near-Surface Mine Plan Upside: **Opportunities exist to further optimize early-
   year mine sequencing, particularly where the high-grade upper clay horizon sits
   near the surface.
 *  **Specific Gravity (SG) Sampling: **The SG dataset includes 512 measurements
   across the tuff and mineralized units. Statistical evaluation indicates that 
   the upper clays have a median bulk density of 1.65 t/m3, while non-mineralized
   materials (tuffs) have a low bulk density of 1.39 t/m3. These values have been
   incorporated into the updated block model, and these revisions will influence
   future mine-planning scenarios once completed.

**Mr. Greg Reimer, President, Chief Executive Officer and Director of Surge, commented,**“
This resource update is a watershed moment for Surge and our joint venture partners
at Evolution Mining. Delivering over 10.5 million tonnes of LCE into the Measured
and Indicated category at grades exceeding 3,000 ppm Li underscores the significance
of the NNLP deposit. This MRE highlights the sheer scalability of the NNLP with 
the PEA mine plan only using 3.6Mt of the M&I resource. The primary objective of
this MRE update was to de-risk the resource for the Pre-Feasibility Study, and the
geological data has emphatically delivered.”

 **Updated Mineral Resource Estimate Statement**

 The MRE was prepared by RESPEC Company, LLC (“RESPEC”), an independent mining and
engineering consulting firm, in accordance with Canadian Institute of Mining, Metallurgy
and Petroleum (“**CIM**“) Definition Standards – For Mineral Resources and Mineral
Reserves adopted by the CIM May 19, 2014, and in accordance with National Instrument
43-101 – _Standards of Disclosure for Mineral Projects_ (“**NI 43-101**“). The resource
is constrained within an optimized pit shell based on a $20,000/t LCE price, utilizing
a cut-off grade of 1,250 ppm Li.

 **Table 1.** 2026 NNLP Measured Resource in bold and sensitivity to different cutoff
grades.

  |   **Category**  |   **Tonnes (Mt)**  |   **Grade (Li ppm)**  |   **Lithium (Mt)**  |   **LCE (Mt)**  |  
 |   Measured  |   210.8  |   3,150  |   0.66  |   3.53  |  
 |   Indicated  |   446.7  |   2,940  |   1.31  |   6.98  |  
 |   **Total M&I**  |   **657.4**  |   **3,007**  |   **1.97**  |   **10.51**  |  
 |   Inferred  |   271.3  |   2,160  |   0.59  |   3.11  |

 **Table 2.** 2026 NNLP Measured Resource in bold and sensitivity to different cutoff
grades.

  |   **Cutoff (Li ppm)**  |   **Tonnes (Mt)**  |   **Grade (Li ppm)**  |   **Lithium (Mt)**  |   **LCE (Mt)**  |  
 |   1,000  |   214.8  |   3,100  |   0.67  |   3.55  |  
 |   **1,250**  |   ** 210.8 **  |   **3,150**  |   ** 0.66 **  |   ** 3.53 **  |  
 |   1,500  |   199.3  |   3,240  |   0.65  |   3.43  |  
 |   1,750  |   187.2  |   3,340  |   0.63  |   3.33  |  
 |   2,000  |   174.4  |   3,450  |   0.60  |   3.20  |  
 |   3,000  |   119.5  |   3,890  |   0.47  |   2.48  |  
 |   4,000  |   44.6  |   4,510  |   0.20  |   1.07  |

 **Table 3.** 2026 NNLP Indicated Resource in bold and sensitivity to different 
cutoff grades.

  |   **Cutoff (Li ppm)**  |   **Tonnes (Mt)**  |   **Grade (Li ppm)**  |   **Lithium (Mt)**  |   **LCE (Mt)**  |  
 |   1,000  |   456.9  |   2,890  |   1.32  |   7.03  |  
 |   **1,250**  |   ** 446.7 **  |   **2,940**  |   ** 1.31 **  |   ** 6.98 **  |  
 |   1,500  |   419.1  |   3,030  |   1.27  |   6.77  |  
 |   1,750  |   389.6  |   3,140  |   1.22  |   6.51  |  
 |   2,000  |   357.5  |   3,250  |   1.16  |   6.19  |  
 |   3,000  |   209.3  |   3,780  |   0.79  |   4.21  |  
 |   4,000  |   64.0  |   4,390  |   0.28  |   1.50  |

 **Table 4.** 2026 NNLP Inferred Resource in bold and sensitivity to different cutoff
grades.

  |   **Cutoff (Li ppm)**  |   **Tonnes (Mt)**  |   **Grade (Li ppm)**  |   **Lithium (Mt)**  |   **LCE (Mt)**  |  
 |   1,000  |   294.4  |   2,080  |   0.61  |   3.26  |  
 |   **1,250**  |   ** 271.3 **  |   **2,160**  |   ** 0.59 **  |   ** 3.12 **  |  
 |   1,500  |   221.7  |   2,330  |   0.52  |   2.75  |  
 |   1,750  |   171.1  |   2,540  |   0.44  |   2.32  |  
 |   2,000  |   129.6  |   2,760  |   0.36  |   1.90  |  
 |   3,000  |   38.6  |   3,560  |   0.14  |   0.74  |  
 |   4,000  |   6.0  |   4,420  |   0.03  |   0.14  |

 _All Table Notes:_

 1.  _The effective date of the NNLP mineral resource estimate is May 1, 2026. _
 2.  _The mineral resource estimate was prepared by RESPEC in metric tonnes under the
    supervision of Mr. Jeff Bickel in accordance with CIM “Estimation of Mineral Resource
    and Mineral Reserves Best Practices” guidelines and reported in compliance with
    NI 43-101. _
 3.  _Resources are constrained by an optimized pit shell. Block grades were interpolated
    using the ID^(2) method in Hexagon MinePlan™ 3D software. _
 4.  _The NNLP mineral resource cut-off grade of 1,250 ppm Li was selected based on
    input provided by Surge and reviewed by the QP. Operating assumptions used to establish
    reasonable prospects for eventual economic extraction include a US$82.43/t operating
    cost, an average recovery of 84.9% Li, and a US$20,000/t LCE price. Blocks outside
    the optimized pit shell do not meet criteria for reasonable prospects for eventual
    economic extraction._
 5.  _A Li to Li_(2)CO_(3) factor of 5.323 was used._
 6.  _Mineral resources are not mineral reserves and do not have demonstrated economic
    viability. An inferred mineral resource has lower confidence than a measured or
    indicated mineral resource and must not be converted to a mineral reserve. Additional
    drilling is required to improve the confidence level of inferred mineral resources._

 The new drilling combines for an aggregate total of 5451.5 meters across 37 drillholes,
underpinning the entire MRE. RESPEC was supplied with three-dimensional geological
shapes generated by NNL which included mineralized clay lithologies hosting lithium.
Mineral resources were estimated by RESPEC as follows:

 *  Evaluated the drill data statistically within relevant clay lithologies, using
   them as domains;
 *  Coded a block model with the domains using the provided geological wireframe
   solids;
 *  Analyzed the mineralization geostatistically by domain to aid in the establishment
   of estimation and classification parameters; and
 *  Interpolated lithium grades into a block model comprised of 50(east-west) x 
   50(north-south) x 5(vertical)-meter blocks using the clay lithology domains to
   explicitly constrain the grade estimation.

**Resource Expansion Opportunities**

 While this MRE update successfully locked in the core of the PFS mine plan, the
geological model highlights several immediate avenues for future resource expansion
and grade optimization:

 *  **Tighter Drill Spacing Upside: **Geostatistical modeling indicates that in 
   areas with lower drill density, the grade estimates are conservatively constrained
   by larger search radiuses. We anticipate that future infill drilling in these
   peripheral zones will naturally pull up the average grade, mirroring the success
   of our recent infill campaign.
 *  **High-Grade Footprint Expansion: **Future targeted drilling will aim to fill
   localized gaps within the deposit, specifically targeting the expansion of the
   >3,000ppm Li footprint to the north.
 *  **Volumetric Increases: **The integration of recent, high-resolution topographic
   surveys has identified shallow areas of increased volumetric potential, particularly
   to the northeast, providing further tonnage upside beyond the current block model.

**Next Steps**

 With the MRE complete, the block model has been formally handed over to Independent
Mining Consultants (IMC) to finalize the PFS mine plan and production schedule. 
Engineering deliverables from Fluor, including the Heat and Material Balance (HMB)
and Process Flow Diagrams (PFDs), have successfully defined a highly efficient and
robust flowsheet. The Metallurgical Testing Program with Kemetco is advancing rapidly,
keeping the Company on track to deliver the comprehensive Pre-Feasibility Study 
in Q4 2026.

 **Technical Report**

 Under NI 43-101, Section 4.2(1)(j), Surge must file a technical report regarding
the updated MRE within forty-five (45) days of the date of this news release.

 **Qualified Person as Defined Under National Instrument 43-101**

 The MRE was prepared for Nevada North Lithium, LLC by independent Qualified Persons(“
QPs”) as defined under NI 43-101. The independent QPs were Mr. Jeff Bickel, C.P.
G., and Mr. Nathan Forsythe, C.P.G., of RESPEC in Reno, Nevada. Both QPs have reviewed
and approved the technical information in this news release that is derived from
the upcoming Technical Report.

 Mr. Bickel and Mr. Forsythe have reviewed the sampling, assaying, and security 
procedures used by Surge at Nevada North, and it is their opinion that they follow
industry standard procedures and are adequate for the estimation of the current 
MRE and for use in preparing the Technical Report.

 Mr. Bickel and Mr. Forsythe completed an audit of the database and verified data
underpinning the MRE. Mr. Forsythe visited the project site on November 4 and 5,
2025.

 Nevada North Lithium exploration activities are supervised by Mr. Alan J. Morris,
C.P.G., Geological Advisor to the Company. Mr. Morris is a qualified person as defined
under NI 43-101. Mr. Morris has reviewed and approved the technical contents of 
this news release.

 **About Surge Battery Metals Inc.**

 Surge Battery Metals Inc., a Canadian-based mineral exploration company, is at 
the forefront of securing the supply of domestic lithium through its active engagement
in the Nevada North Lithium Project. The project focuses on development of high-
grade lithium energy metals in Nevada, USA, a crucial element for powering battery
electric storage and electric vehicles. With a primary listing on the TSX Venture
Exchange in Canada and a listing on the OTCQX Market in the USA, Surge Battery Metals
Inc. is strategically positioned as a key player in advancing lithium exploration.

 **About Evolution Mining Limited**

 Evolution Mining is a leading, globally relevant gold miner. Evolution operates
six mines, comprising five wholly-owned mines – Cowal in New South Wales, Ernest
Henry and Mt Rawdon in Queensland, Mungari in Western Australia, and Red Lake in
Ontario, Canada, and an 80% share in Northparkes in New South Wales.

 **About Nevada North Lithium, LLC**

 Nevada North Lithium, LLC, jointly owned by Surge Battery Metals Inc (70.54%) and
Evolution Mining Limited (29.46%), owns the Nevada North Lithium Project southeast
of Jackpot, Nevada about 73 km north-northeast of Wells, Elko County. The first 
three rounds of drilling at the project identified a strongly mineralized zone of
lithium bearing clays occupying a strike length of more than 4,300 meters and a 
known width of greater than 1,500 meters. Highly anomalous soil values and geophysical
surveys suggest there is potential for the clay horizons to be much greater in extent.
As disclosed in the Company’s Preliminary Economic Assessment dated May 19, 2025(
PEA), completed jointly by M3 Engineering & Technology Corp. and Independent Mining
Consultants (see the Company’s news release dated July 24, 2025 for further information
regarding the PEA), the Nevada North Lithium Project reported an after-tax NPV8%
US $9.17 Billion and after-tax IRR of 22.8% at $24,000/t LCE and an OPEX of US $
5,243/t LCE. The Project now has a pit-constrained Measured & Indicated Resource
containing an estimated 10.51 Mt of Lithium Carbonate Equivalent (LCE) grading 3007
ppm Li at a 1,250-ppm cutoff.

 On behalf of the Board of Directors 
 “Greg Reimer”  Greg Reimer,  Director, President&
CEO

 **Contact Information** 
 Email: [info@surgebatterymetals.com](https://www.thailand-business-news.com/pr-news/info@surgebatterymetals.com)
Phone: 604-662-8184  Website: [surgebatterymetals.com](https://api.newsfilecorp.com/redirect/mjJXxFxP3j)

 **Keep up-to-date with Surge Battery Metals: **[Twitter](https://api.newsfilecorp.com/redirect/kXjRYcYxNP),
[Facebook](https://api.newsfilecorp.com/redirect/B5EGLFPV5M), [LinkedIn](https://api.newsfilecorp.com/redirect/5W8AecWJkM),
[Instagram](https://api.newsfilecorp.com/redirect/LqywpIG01N) and [YouTube](https://api.newsfilecorp.com/redirect/oPQryhB5me).

 _**Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts responsibility
for the adequacy or accuracy of this release. **_

 This document may contain certain “Forward-Looking Statements” within the meaning
of the United States Private Securities Litigation Reform Act of 1995 and applicable
Canadian securities laws. When used in this news release, the words “anticipate”,“
believe”, “estimate”, “expect”, “target”, “plan” or “planned”, “possible”, “potential”,“
forecast”, “intend”, “may”, “schedule” and similar words or expressions identify
forward-looking statements or information. These forward-looking statements or information
may relate to future prices of commodities including lithium and nickel, the accuracy
of mineral or resource exploration activity, reserves or resources, regulatory or
government requirements or approvals including approvals of title and mining rights
or licenses and environmental, local community or indigenous community approvals,
the reliability of third party information, continued access to mineral properties
or infrastructure or water, changes in laws, rules and regulations including in 
the United States, Nevada or California or any other jurisdiction which may impact
upon the Company or its properties or the commercial exploitation of those properties,
currency risks including the exchange rate of USD$ for Cdn$ or other currencies,
fluctuations in the market for lithium related products, changes in exploration 
costs and government royalties, export policies or taxes in the United States or
any other jurisdiction and other factors or information. The Company’s current plans,
expectations, and intentions with respect to development of its business and of 
its Nevada properties may be impacted by economic uncertainties arising out of any
pandemic or by the impact of current financial and other market conditions (including
US government subsidies or incentives) on its ability to secure further financing
or funding of its Nevada properties. Such statements represent the Company’s current
views with respect to future events and are necessarily based upon several assumptions
and estimates that, while considered reasonable by the Company, are inherently subject
to significant business, economic, competitive, political, environmental (including
endangered species, habitat preservation and water-related risks) and social risks,
contingencies, and uncertainties. Many factors, both known and unknown, could cause
results, performance, or achievements to be materially different from the results,
performance or achievements that are or may be expressed or implied by such forward-
looking statements. The Company does not intend, and does not assume any obligation,
to update these forward-looking statements or information to reflect changes in 
assumptions or changes in circumstances or any other events affecting such statements
and information other than as required by applicable laws, rules, and regulations**.**

 **Figure 1:** Plan view showing the Upgraded MRE at the NNLP with a 1,250ppm Li
cutoff. The $20,000 LCE pit area is shown in dark gray. Four section lines indicate
the location of the cross sections below.

![111.jpg](https://release.media-outreach.com/release.php/Images/763968/111.jpg#
image-763968)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_001full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_001full.jpg)

 **Figure 2:** Section 1 cross section looking ENE at pit-constrained blocks of 
the Upgraded block model. The blue dashed line indicates the historical PEA mine
plan pit boundary.

![222.jpg](https://images.media-outreach.com/release.php/Thumb/1600x265/763975/763975-
222-jpg-1600x265.jpeg)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_002full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_002full.jpg)

 **Figure 3:** Section 2 cross section looking E at pit-constrained blocks of the
Upgraded block model. Note the significant expansion of high-grade mineralization
on the southern half of this section, well outside the boundaries of the historical
PEA Mine Plan Pit.

![333.jpg](https://images.media-outreach.com/release.php/Thumb/1600x319/763982/763982-
333-jpg-1600x319.jpeg)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_003full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_003full.jpg)

 **Figure 4:** Section 3 cross section looking NNE at pit-constrained blocks of 
the Upgraded block model. Note the continuous high-grade blocks located immediately
below the historical PEA Mine Plan Pit boundary, highlighting high-grade vertical
expansion opportunities.

![444.jpg](https://images.media-outreach.com/release.php/Thumb/1600x350/763989/763989-
444-jpg-1600x350.jpeg)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_004full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_004full.jpg)

 **Figure 5:** Section 4 cross section looking NW at pit-constrained blocks of the
Upgraded block model. Note the high-grade mineralization extending beneath the historical
PEA Mine Plan Pit in the center of the section, plus the high-grade blocks in the
topographic low to the southwest, demonstrating significant expansion opportunities
both near surface and at depth.

![555.jpg](https://images.media-outreach.com/release.php/Thumb/1600x353/763996/763996-
555-jpg-1600x353.jpeg)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_005full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_005full.jpg)

 **Figure 6:** Plan view showing Measured & Indicated Blocks above 1,250ppm Li Cutoff.
The $20,000 LCE pit area is shown in dark gray, and the PEA Mine Plan Pit outlined
in black. In addition to converting approximately 87% of the PEA Mine Plan Pit to
M&I, there is a significant lateral expansion of M&I blocks outside the historical
pit boundary both laterally and at depth below the pit shell (as detailed in the
cross sections of Figures 2-5).

![666.jpg](https://release.media-outreach.com/release.php/Images/764003/666.jpg#
image-764003)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_006full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_006full.jpg)

 **Figure 7:** Plan view showing Measured & Indicated Classifications generated 
from the Upgraded MRE at the NNLP with a 3,000ppm Li cutoff. The $20,000 LCE pit
area is shown in dark gray, and the PEA Mine Plan Pit outlined in black. This high-
grade view clearly illustrates the robust lateral continuity of the >3000ppm M&I
resource extending well beyond the historical PEA limits, alongside the significant
depth potential demonstrated in the previous cross sections (Figures 2-5).

![777.jpg](https://release.media-outreach.com/release.php/Images/764010/777.jpg#
image-764010)

 To view an enhanced version of this graphic, please visit: 
 [https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_007full.jpg](https://images.newsfilecorp.com/files/9838/297367_4ef3f0e804d8b948_007full.jpg)

The issuer is solely responsible for the content of this announcement.

![](//track.media-outreach.com/index.php/WebView/464998/36955)

**Source** : [Surge Announces Resource Upgrade at Nevada North: 657.5 Mt Grading @ 3,007 ppm Li Containing 10.5 Mt LCE Measured and Indicated Including 6.7 Mt LCE @ 3,820 ppm Li](https://www.media-outreach.com/news/canada/2026/05/15/464998/?rand=186006)

---

  |  This article was produced by Media OutReach, our trusted news partner. The views expressed and the content presented here are solely those of the author and may not reflect the opinions of Thailand Business News. |

---

![Media OutReach Newswire](https://i0.wp.com/www.thailand-business-news.com/wp-content/
uploads/2025/04/media-outreach-20025.png?ssl=1)
