# UEM Edgenta Cements Role In Delivering Pan Borneo Highway Sarawak

- Link: https://www.thailand-business-news.com/pr-news/uem-edgenta-cements-role-in-delivering-pan-borneo-highway-sarawak
- Published: 2026-07-13T10:00:00+07:00
- Author: Media OutReach

#### _Empowering Local Workforce For Future Mega-Projects_

KUALA LUMPUR, MALAYSIA – [Media OutReach Newswire](https://www.media-outreach.com/)–
13 July 2026 – UEM Edgenta Berhad (“UEM Edgenta” or “the Company”), a leading Asset
Management and Infrastructure Solutions company serving as the appointed Independent
Checking Engineer (ICE), has successfully steered the development of Pan Borneo 
Highway Sarawak. The project marks a significant milestone in strengthening Sarawak’s
transport connectivity, unlocking greater economic opportunities and improving access
for communities across the state.

 The Pan Borneo Highway is expected to enhance mobility, improve logistics efficiency
and support long-term socio-economic growth by connecting towns, rural communities
and key economic corridors. Beyond the physical infrastructure, the project represents
a long-term investment in the state’s resilience, competitiveness and quality of
life.

 Spearheaded by _Jabatan Kerja Raya Sarawak_ as the project’s principal team lead,
this achievement was executed through UEM Edgenta’s critical governance, technical
oversight, and project management expertise. Drawing on its experience managing 
more than RM100 billion worth of major infrastructure projects across Malaysia, 
the Company ensured every stage of delivery adhered to stringent standards of quality,
safety, regulatory compliance and sustainability.

 To navigate the physical realities of Sarawak’s vast landscape, UEM Edgenta’s experience
in managing mega projects such as the PLUS Highways, the Penang Bridge, and international
infrastructure projects contributed to the highway’s development. Overseeing a project
of this scale meant implementing advanced structural reviews to address deep and
unstable soil conditions, engineering resilient solutions to bridge extensive river
networks and managing highly complex logistical supply chains across vast, remote
distances. By tailoring these engineering solutions to Sarawak’s specific topographical
and climate challenges, the technical oversight provided by UEM Edgenta helped ensure
that the physical asset is designed to minimise future maintenance costs, reduce
environmental impact and maximise structural resilience for decades to come.

 Stretching approximately 786 kilometers from Telok Melano in the south to Merapok
in the north, Phase 1 of the Pan Borneo Highway represents one of the most ambitious
civil engineering undertakings in Southeast Asia. UEM Edgenta’s technical governance
oversaw the successful delivery of 115 bridges and 25 complex interchanges, navigating
treacherous topography and vast river networks.

 Moreover, managing this mammoth operation required logging millions of safe man-
hours, laying down immense volumes of specialised asphalt, and coordinating a massive
daily workforce. All these were deployed with uncompromising safety and operational
standards on the ground.

 Commenting on the sheer magnitude of the operations involved, Shaiful Subhan, Managing
Director/Chief Executive Officer of UEM Edgenta, said, “Delivering an infrastructure
project on the scale of the Pan Borneo Highway across Sarawak’s vast and diverse
landscape demands exceptional technical expertise, disciplined governance and close
collaboration among all stakeholders. At UEM Edgenta, we are proud to have supported
this vision by providing the engineering oversight, project management and quality
assurance needed to deliver infrastructure of this complexity. Through proven engineering
practices and rigorous project governance, we have helped ensure this highway will
serve the people of Sarawak safely, reliably and sustainably for generations to 
come.”

 Beyond infrastructure delivery, the Company has also contributed to strengthening
Sarawak’s engineering ecosystem through the development of local talent and industry
capabilities. Recognising that sustainable infrastructure is built not only through
physical assets but also through people, UEM Edgenta has embedded capability building
throughout the project by integrating local contractors and professionals into internationally
recognised project management and engineering practices.

 Today, more than 70% of UEM Edgenta’s workforce supporting projects in Sarawak 
comprises local talent, reflecting the company’s commitment to developing homegrown
expertise. Strategic collaborations, including its ongoing partnership with Swinburne
University of Technology Sarawak Campus, have further strengthened the local talent
pipeline through internships, graduate programmes and technical knowledge transfer.
These initiatives not only support the successful delivery of today’s infrastructure
projects but also help cultivate the next generation of Sarawakian engineering professionals
equipped to lead the state’s future development.

 For UEM Edgenta’s Sarawak team on the ground, the project transcends corporate 
milestones; it taps into deep local sentiment and is a matter of profound state 
pride.

 Reflecting on the socio-economic weight of the project, Raihana Ahmad, Managing
Director of Infrastructure Solutions at UEM Edgenta, said, “The Pan Borneo Highway
is more than a road, it is a catalyst for unity, progress and opportunity across
Sarawak. For our team in Sarawak, delivering this long-awaited vision has been deeply
meaningful because it is, ultimately, about improving the lives of the communities
we serve. We are proud to stand shoulder to shoulder with the Sarawak State Government,
our partners and local contractors to help bring this vision to life, while strengthening
local capabilities that will support the state’s future infrastructure ambitions.”

 Marking its final completion milestones, the Pan Borneo Highway stands as a testament
to what can be achieved when a client’s bold vision is met with uncompromising engineering
expertise. With a highly skilled local workforce now equipped with world-class operational
standards, Sarawak is primed for its next great leap.

 As the state gears up to celebrate Sarawak Day in July and continues to expand 
its horizons through highly anticipated mega-projects like the Coastal and Second
Trunk Roads which consists of the iconic Batang Lupar 1 Bridge being the record 
longest river-crossing bridge in Malaysia; UEM Edgenta remains steadfastly positioned
to drive the realisation of the Sarawak Government’s aspirations.

 For further information on UEM Edgenta, log on to [https://www.uemedgenta.com](https://www.uemedgenta.com).

Hashtag: #UEMEdgenta

[https://www.uemedgenta.com](https://www.uemedgenta.com)

The issuer is solely responsible for the content of this announcement.

#### About UEM Edgenta Berhad

UEM Edgenta Berhad (“UEM Edgenta”), a wholly-owned subsidiary of UEM Group Berhad,
is an Asset Management and Infrastructure Solutions company that delivers integrated,
end-to-end solutions across the entire asset lifecycle, combining engineering excellence
in design, project management and asset consultancy with tech-enabled asset management
capabilities to optimise asset performance, efficiency and resilience.

 With operations across Malaysia, Singapore, Indonesia, Taiwan, the United Arab 
Emirates and the Kingdom of Saudi Arabia, UEM Edgenta supports the reliable and 
sustainable performance of critical assets, including healthcare facilities, transportation
networks and industrial infrastructure.

![](//track.media-outreach.com/index.php/WebView/474875/36955)

**Source** : [UEM Edgenta Cements Role In Delivering Pan Borneo Highway Sarawak](https://www.media-outreach.com/news/malaysia/2026/07/13/474875/?rand=186006)

---

  |  This article was produced by Media OutReach, our trusted news partner. The views expressed and the content presented here are solely those of the author and may not reflect the opinions of Thailand Business News. |

---

![Media OutReach Newswire](https://i0.wp.com/www.thailand-business-news.com/wp-content/
uploads/2025/04/media-outreach-20025.png?ssl=1)
